About our underwater demolition work in Icard
Our underwater demolition crews reach Icard as part of the wider Gastonia area, 36 miles away.
The general process is on the underwater demolition page; this page is about doing it well in Icard.
QUICK ANSWERS
- Underwater Demolition permit
- Required; we file it with the county
- Region
- Mountains
- Owner-occupied homes
- 72%
- Elevation
- About 1,194 ft
- Main soil
- Fairview (well drained)
What Icard’s homes tell us about underwater demolition
Icard’s homes are 77% detached houses, 21% mobile homes. Mobile homes are far more common here than the 11% statewide, so pads, tie-downs and skirting come up constantly in underwater demolition (American Community Survey).
Home values in Icard center on $137,000, a little below the Burke County median of $171,000.
What drives underwater demolition in Icard
With no town government, Icard (about 2,000 residents) falls under Burke County for permits and ordinances.
In Icard, underwater demolition is usually about redevelopment of older industrial, civil and specialty structures.
Icard and nearby towns for underwater demolition
Ground in Icard means hillside sites with rock close to the surface and tight roads, typical of the Mountains; we plan underwater demolition around it, as we do across the Gastonia area.
Some background: elevation near 1,194 feet (Icard on Wikipedia).
Icard residents can find ordinances and permit contacts on the Burke County website.
Hildebran, Connelly Springs, Rhodhiss and Long View are a short drive from Icard and on our underwater demolition schedule too.
Where debris from underwater demolition in Icard goes
Mixed demolition debris from Icard can go to Burke County Johns River Waste Management in Morganton, the nearest active C&D landfill permitted by the NC DEQ Solid Waste Section, about 11 miles off. Clean concrete, brick and stumps have a closer option at Little Mountain Construction LCID in Maiden, an LCID landfill about 24 miles away.
Icard rules that apply to underwater demolition
Specialty work in Icard starts with a permit from the Burke County inspections office, plus any engineering or agency approvals the method needs. Unincorporated Icard is usually permitted by Burke County; we check for any town jurisdiction first, then file. Asbestos rules for Icard are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.
We follow the requirements of NC Division of Coastal Management, OSHA: Commercial diving operations and EPA: Wetlands on every Icard job. Flood maps for Icard are on the NC Flood Risk Information System.
When to book underwater demolition in Icard
At about 1,194 feet above sea level, Icard gets real winters, with snow and ice on higher ground, and hard rain on slopes can bring flash floods. Most Icard customers book underwater demolition for late spring and early fall. December through February bring snow, ice and frozen ground that make steep driveways and slopes unsafe for heavy equipment.
Storm history matters in Burke County: western North Carolina is still clearing homes damaged when Hurricane Helene brought record flooding and landslides in September 2024.
Pricing underwater demolition in Icard
What is specific to pricing underwater demolition in Icard:
- Slope. Steep Icard sites need smaller machines and more protection.
Underwater Demolition near Icard: map
Get a free underwater demolition quote in Icard
ICARD · BURKE COUNTY
Need underwater demolition in Icard?
Tell us about the Icard property and we will set up a free visit.