Underwater Demolition in Speed
Speed is about 20 miles from Rocky Mount, and our crews work across the area.
The general process is on the underwater demolition page; this page is about doing it well in Speed.
QUICK ANSWERS
- Underwater Demolition permit
- Required; we file it with the Town of Speed or county
- Region
- Coastal Plain
- Owner-occupied homes
- 76%
- Elevation
- About 56 ft
- Main soil
- Norfolk (well drained)
What Speed’s homes tell us about underwater demolition
By building type, Speed is 44% detached houses, 56% mobile homes. That mobile-home share dwarfs North Carolina’s 11%, and it shapes underwater demolition around Speed (American Community Survey).
76% of occupied Speed homes are owner-occupied, above the state’s 66%, so most underwater demolition customers here are homeowners deciding for themselves.
What drives underwater demolition in Speed
U.S. Census Bureau figures show Speed going from 64 residents (2020) to 65 (2024), a roughly stable population.
In a settled town like Speed, most underwater demolition calls come from redevelopment of older industrial, civil and specialty structures.
Underwater Demolition around Speed and Edgecombe County
Ground in Speed means sandy soil and a high water table, typical of the Coastal Plain; we plan underwater demolition around it, as we do across the Rocky Mount area.
Some background: elevation near 56 feet (Speed on Wikipedia).
Local permit offices, fee schedules and notices are published on the Edgecombe County website.
Hobgood, Princeville, Tarboro and Leggett are a short drive from Speed and on our underwater demolition schedule too.
Where debris from underwater demolition in Speed goes
The nearest active C&D landfill on the NC DEQ Solid Waste Section permitted list is Edgecombe County CDLF in Tarboro, about 12 miles from Speed. Clean concrete, brick and stumps have a closer option at Barnhill Contracting LCID Landfill in Rocky Mount, an LCID landfill about 17 miles away.
Speed rules that apply to underwater demolition
Specialty work in Speed starts with a permit from the Town of Speed or the Edgecombe County inspections office, plus any engineering or agency approvals the method needs. We confirm whether the Town of Speed or Edgecombe County handles your Speed address, then file the permit there. Asbestos rules for Speed are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.
For underwater demolition in Speed, the rules come from NC Division of Coastal Management, OSHA: Commercial diving operations and EPA: Wetlands. Flood maps for Speed are on the NC Flood Risk Information System.
When to book underwater demolition in Speed
At about 56 feet above sea level, Speed sees long, humid summers and a hurricane season from June through November; low ground stays wet for days after heavy rain. Most Speed customers book underwater demolition for November through April. August and September bring tropical weather and soaked ground that make sites unworkable.
Storm history matters in Edgecombe County: hurricane Floyd in September 1999 caused record flooding across the Tar and Neuse river basins, and the buyouts that followed meant many flooded homes were demolished.
Pricing underwater demolition in Speed
What is specific to pricing underwater demolition in Speed:
- Flood and coastal rules. Edgecombe County coastal and flood rules can add paperwork.
Underwater Demolition near Speed: map
Get a free underwater demolition quote in Speed
SPEED · EDGECOMBE COUNTY
Need underwater demolition in Speed?
Tell us about the Speed property and we will set up a free visit.