Underwater Demolition in Stallings
Stallings added 9.3% to its population from 2020 to 2024. Part of Stallings lies in Mecklenburg County.
The general process is on the underwater demolition page; this page is about doing it well in Stallings.
QUICK ANSWERS
- Underwater Demolition permit
- Required; we file it with the Town of Stallings or county
- Region
- Piedmont
- Owner-occupied homes
- 90%
- Elevation
- About 764 ft
- Main soil
- Cecil (well drained)
Underwater Demolition and the Stallings housing stock
By building type, Stallings is 86% detached houses. Most Stallings underwater demolition jobs are on private single-family lots (American Community Survey).
Homeowners own 90% of occupied homes in Stallings (statewide: 66%), and they make up most of our underwater demolition work there.
What drives underwater demolition in Stallings
Stallings had 16,122 residents at the 2020 baseline, and the U.S. Census Bureau estimates 17,617 by July 2024, growth of 9.3%, ahead of the statewide 5.8%.
Here, demand for underwater demolition comes mostly from redevelopment of older industrial, civil and specialty structures.
Where we provide underwater demolition near Stallings
Ground in Stallings means red clay that turns slick after rain, typical of the Piedmont; we plan underwater demolition around it, as we do across the Charlotte area.
Some background: elevation near 764 feet (Stallings on Wikipedia).
Local permit offices, fee schedules and notices are published on the Town of Stallings website and the Union County website.
Underwater Demolition is also available in Weddington, Wesley Chapel, Fairview, Unionville, Marvin and Wingate, all in Union County.
Hemby Bridge, Lake Park, Matthews and Indian Trail are a short drive from Stallings and on our underwater demolition schedule too.
Permitted disposal sites for underwater demolition near Stallings
For Stallings, the closest permitted construction and demolition landfill is Union County C&D in Wingate (Union County), roughly 12 miles away, per the NC DEQ Solid Waste Section. Clean concrete, brick and stumps have a closer option at Griffin Farm LCID Landfill in Monroe, an LCID landfill about 10 miles away.
Underwater Demolition permits and regulations in Stallings
Specialty work in Stallings starts with a permit from the Town of Stallings or the Union County inspections office, plus any engineering or agency approvals the method needs. The Town of Stallings or Union County inspections office issues the permit, and we handle the application for your Stallings property. For Stallings properties, the state Health Hazards Control Unit handles asbestos notices, and we file what is required before work starts.
For underwater demolition in Stallings, the rules come from NC Division of Coastal Management, OSHA: Commercial diving operations and EPA: Wetlands.
Best time for underwater demolition in Stallings
Stallings, around 764 feet up, gets hot, humid summers with afternoon thunderstorms and short, mild winters broken by the odd ice storm. October and November is usually the best window for underwater demolition here, with firm ground and comfortable working days; July and August are the hardest months.
Storm history matters in Union County: hurricane Hugo’s 1989 winds reached far inland, bringing down trees across the Charlotte region.
Underwater Demolition near Stallings: map
Get a free underwater demolition quote in Stallings
STALLINGS · UNION COUNTY
Need underwater demolition in Stallings?
Tell us about the Stallings property and we will set up a free visit.