SWAN QUARTER · HYDE COUNTY · NC

Building Demolition in Swan Quarter, NC

Building Demolition for Swan Quarter properties, priced after a free visit and carried out by one Hyde County crew.

Service areaSwan Quarter & Hyde County
PopulationAbout 290
EstimateFree site visit, fixed quote

FREE ESTIMATE

Free building demolition quote in Swan Quarter

Free, fixed & itemized. No obligation.

Or call us +1 984-254-7755

About our building demolition work in Swan Quarter

Our Coastal Plain crews cover Swan Quarter.

For the full scope of the service, see our building demolition page. Here we focus on Swan Quarter: its housing, rules, ground and weather.

QUICK ANSWERS

Building Demolition permit
Required; we file it with the county
Typical home built
1963 (80% before 1980)
Median home value
$110,000
Best months
November through April
County
Hyde County

What Swan Quarter’s homes tell us about building demolition

The typical home in Swan Quarter was built around 1963, older than the Hyde County median of 1978, according to American Community Survey estimates. 80% predate 1980, 7% before 1940, so older materials like asbestos siding, floor tile and lead paint are a real possibility in Swan Quarter, so we test before any teardown.

Homeowners own 95% of occupied homes in Swan Quarter (statewide: 66%), and they make up most of our building demolition work there.

Swan Quarter at a glance for building demolition

About 290 people live in unincorporated Swan Quarter, where Hyde County sets most of the rules.

Older buildings reaching the end of their life and lots being cleared for new construction drive most building demolition calls from Swan Quarter.

Swan Quarter ground conditions and building demolition

Across Swan Quarter, the most common soil in the USDA soil survey is the Hydeland series (5 of nine sample points). It is very poorly drained and slow to absorb rain (hydrologic group C/D, when drained), on mapped slopes of 0–2%. The seasonal water table can rise to about 1 foot below the surface, flooding is mapped as rare and the survey rates the ground “very limited” for homes with basements.

That “very limited” rating is a warning for any rebuild with a basement: drainage and waterproofing need a plan before the new foundation goes in. Slow-draining ground sheds rain instead of soaking it up, so Swan Quarter sites get silt fence and positive drainage as soon as soil is exposed.

Where we provide building demolition near Swan Quarter

Our building demolition crews cover Swan Quarter and the rest of Hyde County.

According to Swan Quarter on Wikipedia, Swan Quarter is a long-standing community and stands about 7 feet up.

Swan Quarter residents can find ordinances and permit contacts on the Swan Quarter website and the Hyde County website.

Neighbors of Swan Quarter we serve: Fairfield, Engelhard, Belhaven and Pantego.

Swan Quarter landfills and transfer stations for building demolition

For Swan Quarter, the closest permitted construction and demolition landfill is C & D Landfill Inc in Greenville (Pitt County), roughly 51 miles away, per the NC DEQ Solid Waste Section.

Permits and rules for building demolition in Swan Quarter

Demolishing a building in Swan Quarter requires a permit from the Hyde County inspections office. When a permit is needed, we file it with Hyde County’s inspections office, or a nearby town if the lot is in its jurisdiction. 80% of Swan Quarter’s homes predate 1980, so asbestos rules from the state Health Hazards Control Unit apply to many jobs here.

We follow the requirements of OSHA: Demolition safety, EPA: Asbestos NESHAP, OSHA: Cranes and derricks and OSHA: Fall protection on every Swan Quarter job. Hyde County is one of North Carolina's coastal counties, so work near water in Swan Quarter may need a permit from the NC Division of Coastal Management. Flood maps for Swan Quarter are on the NC Flood Risk Information System.

Swan Quarter weather and building demolition scheduling

At about 7 feet above sea level, Swan Quarter has hot, sticky summers, mild winters and Atlantic hurricane season from June through November. Most Swan Quarter customers book building demolition for November through April. August and September bring peak hurricane season, heavy heat and saturated ground that stop work.

Storm surge from Hurricane Isabel in 2003 swept the Outer Banks and the sounds, damaging thousands of homes, a reminder for property owners across Hyde County of how storms create demolition and clean-up work.

Pricing building demolition in Swan Quarter

Beyond size, materials and access, these Swan Quarter factors affect the price:

  • What the property is worth. Swan Quarter homes have a median value of about $110,000; that context shapes how much a building demolition project makes sense.
  • Haul distance. The nearest permitted facility for this debris is about 51 miles from Swan Quarter, so trucking time is part of the price.
  • Coastal permitting. Hyde County coastal and flood rules can add paperwork.

Building Demolition near Swan Quarter: map

Get a free building demolition quote in Swan Quarter

SWAN QUARTER · HYDE COUNTY

Need building demolition in Swan Quarter?

Send your Swan Quarter address for a free site visit and a fixed, itemized quote.

LIVE · NATIONAL WEATHER SERVICE

Building Demolition weather outlook for Swan Quarter this week

How the next seven days in Swan Quarter, Hyde County affect building demolition, from the official National Weather Service forecast.

Loading the latest forecast for Swan Quarter…

READY TO CLEAR THE SITE?

Tell us about your building demolition project in Swan Quarter.

Send a few project details and our team will get back to you with the next steps.

Sends your details to us on WhatsApp for a fast, free estimate. No obligation.

FAQ

Building Demolition in Swan Quarter: FAQs

Can’t find your answer? Call us or send your project details and a specialist will get back to you.

Ask a Specialist ↗
Do I need a permit for building demolition in Swan Quarter?

Demolishing a building in Swan Quarter requires a permit from the Hyde County inspections office.

Are older homes in Swan Quarter likely to contain asbestos?

Census estimates put the median Swan Quarter home at 1963, with 80% built before 1980 and 7% before 1940. Asbestos was common in homes of that era, so many Swan Quarter jobs need testing under the state Health Hazards Control Unit's rules before work starts.

Can you work on a vacant or seasonal property in Swan Quarter?

Yes. About 31% of Swan Quarter’s homes are vacant at any time, mostly seasonal and vacation homes. We can handle building demolition for absent owners, with photo updates and key or lockbox access.

What will we dig into in Swan Quarter?

The USDA soil survey shows mostly Hydeland soils, very poorly drained and a seasonal water table that can rise to about 1 foot.

Last updated · Reviewed by the Alpha Demolition project team

Call usWhatsApp